MicroStrategy ONE

How to Drill In and Out of a Waterfall Chart

Drilling allows you to view data at different levels in a waterfall chart.

  1. Select a waterfall chart visualization.
  2. Select the elements you want to drill on.
  3. Right-click the selected elements, choose Drill, and the attribute to which you want to drill. Only the elements you select appear. The drill-to attribute you select groups the elements.

To undo drilling in a waterfall chart

  1. Hover over the visualization to display the Filter icon in the title bar.
  2. Click Filter .
  3. Choose Clear "drill conditions" to remove a specific drill condition.

  4. In the Editor panel, replace or remove any attributes or metrics that were removed or added as part of the drilling.

You can also click Undo to undo drilling.